Cutlass Solar II
Booth, TX
Five S performed all civil scope work for the development of Cutlass Solar Phase II, developing 1125 acres for solar panel energy generation. Our activities included clearing and grubbing, installation of silt fencing, installation of Baselock fabgrid, access to and throughout the site, dewatering and drainage to include rip rap installation, stripping and re-spreading, cut-to-fill mass grading, lime soil stabilization and installation of AC, FO, bare ground wiring and power junction boxes.